Why do so?
Various reasons can mess up the count of produced units, for example a network failure which temporarily paused communication between the machine and the system, or an unusable mold cavity issue that began before the units in cycle value was adjusted.
The result is that the system either counted less than what was produced, or more than what was produced. To fix the count and ensure data integrity, use this action and adjust the counted quantity.
To fix units produced
Tap the Job Actions menu.
Tap Fix Units Produced.
In the Units to Add/Remove dialog that's displayed:
Enter the number of units to add,
or enter the number of units to remove by prefixing the number with a minus symbol, for example-7
.Tap REPORT. A confirmation message appears briefly at the top and the dialog closes.
Administration info
By default this action is disabled for operators. To enable it:
Go to Settings > Tablet Screens Customization > Actions permissions.
In Select a machine for editing select the department and machine.
In the Job Action section on the right enable Fix Units Produced.
In the Apply to section on the left set the scope of the configured actions permissions (all machines of the same machine type, or selected machines) and click Save.