Skip to main content
KPIs By Shift

Department view Shift component

Updated over a year ago

A dashboard component available in the department Shift page that is used for comparing between shifts' KPIs for the current day. This comparison is very useful for detecting and addressing low performance during the shift in real-time.

The KPIs you can select for the comparison are:

  • Availability OEE

  • Availability PE

  • Cycle Time Efficiency

  • Quality Index

  • OEE

  • PE

You can choose whether to base shift KPI information on Absolute percentage (maximum production theoretically possible), or on Target percentage, which reflects actual production goals that you have set.

When choosing the later (basing the calculation on set targets), the performance indicators will be higher. For example, if the set target for the shift's PE is 80% and the current performance is 65% this is calculated as 81% (65/80), compared to 65% when choosing Absolute percentage, and the color coding of the table cells changes accordingly.

target percentage compared to absolute percentage illustration

You can also set whether the target is indicated in the table cells or not.

animated GIF of the component's options

TIP

The color of KPIs in this component can be customized.

A table row filled with a solid gray color and no values indicates that the machine wasn’t scheduled for production.


Related articles

TIP

For more Shift component articles, search the KB using the name of the component.

Did this answer your question?