Initially, insights were separated to factory insights and department insights. From version 3.0 all insights are consolidated to one list which is available for both levels.

This has extended the scope of factory-level analytics and enables flexible comparisons between departments.

Since insights have numeric identifiers, which are often used as search criteria, consolidated insights will use a single, unique identifier as detailed in the following table.

Insights that were changed are in bold, with (f) signposting the obsolete factory level identifier.

This table can be downloaded as an Excel file here.

Category

Insight name

Current identifier

Identifier history

KPIs

OEE losses - by department

171

KPIs

PE losses - by department

172

KPIs

KPI analysis

237

KPIs

Get KPI Measures By Period

230

KPIs

OEE losses - by period

147

(f)169 obsolete

KPIs

OEE losses - by machine

149

KPIs

OEE losses - by product

151

KPIs

OEE losses - by mold

153

KPIs

PE losses - by period

148

(f)170 obsolete

KPIs

PE losses - by machine

150

KPIs

PE losses - by product

152

KPIs

PE losses - by mold

154

KPIs

Availability PE- by shift starting time

3

KPIs

Availability PE - by day of the week

6

Trend

OEE - by period

45

(f)61 obsolete

Trend

Availability OEE - by period

54

(f)75 obsolete

Trend

PE - by period

42

(f)60 obsolete

Trend

Availability PE - by period

51

(f)74 obsolete

Trend

Cycle Time Efficiency - by period

57

(f)76 obsolete

Trend

Quality index - by period

48

(f)79 obsolete

Performance

Aggregated performance- table view

247

Performance

Complete shift-job details

195

Performance

Units produced - by department

144

Performance

Total Units produced

32

(f)143 obsolete

Performance

Units produced - by machine/mold/product

33

Performance

Units produced - by period

66

(f)70 obsolete

Performance

Actual vs. Standard rate - by mold/product

23

Performance

Cycle Time Efficiency - by machine

213

Performance

Inventory items - reported quantity

248

Performance

Production quantities analysis

239

Rejects

Rejects - by department

191

Rejects

Rejects -by period

184

(f)193 obsolete

Rejects

Reject reasons - by department

192

Rejects

Rejects - by machine

182

Rejects

Rejects - by product

19

Rejects

Rejects - by molds

21

Rejects

Rejects reasons - Pareto

181

(f)190 obsolete

Rejects

Rejects reasons - Pie chart

62

(f)63 obsolete

Rejects

Rejects reasons - by machine

183

Rejects

Rejects reasons - by period

185

(f)194 obsolete

Time distribution

Avg. shift changeover (min.) - by machine

240

Time distribution

PE waterfall

205

(f)218 obsolete

Time distribution

PE waterfall - by period

206

Time distribution

PE waterfall by machine

234

Time distribution

Time distribution - Pie chart

164

(f)179 obsolete

Time distribution

Time distribution - Pie chart

249

Time distribution

Time distribution (%) - by department

177

Time distribution

Time distribution (%) - by period

156

(f)175 obsolete

Time distribution

Time distribution - by machine

157

Time distribution

Time distribution - by product

158

Time distribution

Time distribution - by mold

159

Stop reasons

Distribution of stop events - by period

126

Stop reasons

Distribution of number of stop events - by period

221

Stop reasons

Distribution of stop events to reported and unreported- Pie chart

136

Stop reasons

Stop events to reported and unreported- by machine

100

Stop reasons

Distribution of stop events groups- Pie chart

117

(f)120 obsolete

Stop reasons

Distribution of stop events to events groups- Pareto

116

(f)121 obsolete

Stop reasons

Distribution of stop events groups- by period

125

(f)132 obsolete

Stop reasons

Distribution of stop events groups- by machine

123

Stop reasons

Distribution of stop events reasons- Pie chart

115

(f)65 obsolete

Stop reasons

Distribution of stop events reasons- Pareto

134

(f)139 obsolete

Stop reasons

Distribution of stop events reasons- by period

124

(f)131 obsolete

Stop reasons

Distribution of stop events reasons- by machine

135

Stop reasons

Distribution of stop events reasons- by department

140

Stop reasons

Distribution of stop events to reported and unreported- by department

112

Stop reasons

Distribution of stop events to idle time and downtime- Pie chart

133

Stop reasons

Distribution of stop events to idle time and downtime- by machine

97

Setup

Actual setup analysis

245

Setup

Actual vs. standard setup duration

246

Workers

Workers performance- OEE

188

Workers

Workers performance- Availability OEE

186

Workers

Workers performance- PE

189

Workers

Workers performance- Availability PE

16

Workers

Workers performance- Quality index

187

Workers

Workers performance- Cycle Time Efficiency

229

Workers

Stop events to reported and unreported- by worker

222

Maintenance

MTW- Mean Waiting Time

214

Maintenance

MTTR- Mean Time To Repair Over Time

211

Maintenance

MTBF- Mean Time Between Failures Over Time

212

Maintenance

Technical availability by period

210

Maintenance

Service calls- by machine

9

Maintenance

Service calls – by shift starting time

10

Maintenance

Service calls – by days of the week

11

Maintenance

Service calls - by status

12

Maintenance

Upcoming molds' treatments

17

Maintenance

Recent molds' treatments

18

QC

QC Failed fields distribution

236

QC

Number of tests by machine/mold/product

235

Production lines

The line's stop event root cause

215

Production lines

Distribution of stop events reasons in production line- Pareto

223

Production lines

Distribution of stop events to events groups in production line- Pareto

224


Related articles

Did this answer your question?